Smart city islamabad logo smart city loading
First order of Smart Waste Management System for Capital Smart City
  • Home
  • /
  • News
  • /
  • First order of Smart Waste Management System for Capital Smart City

First order of Smart Waste Management System for Capital Smart City

Published On: 19 Oct 2020

First order of Smart Waste Management System for Capital Smart City and Royal Orchard, Multan is ready to dispatch from Italy. The equipment is purchased from ESA - Italy’s largest Waste Management Company. Inspection of the material carried out on 15th October 2020 at ESA factory in Reggio Emilia, Italy by Capital Smart City team.

Initially we have purchased 348 Garbage boxes along with two Garbage Collection trucks (IVECO) and Solar Powered Garbage compactors. Each basket's capacity is 3,000 liters and truck can hold 21 Cubic Meter (10 tons) for compacted waste with auto collection of waste, automatic transmission and command based operations. Trucks are equipped with PLC and Trackers with cameras so the work will be monitored from Control room to improve the efficiency of system and manpower resource

Smart Waste Management system has never been introduced in Pakistan neither by Government or by any other private sector.